PENGARUH BEBAN KERJA TERHADAP KINERJA KARYAWAN BONGKAR MUAT DI UPT TERMINAL STASIUN SEMARANG TAWANG (SMT): STUDI KASUS PROSES BONGKAR MUAT KAI LOGISTIK

FAHMI FAUZI, MUHAMMAD (2023) PENGARUH BEBAN KERJA TERHADAP KINERJA KARYAWAN BONGKAR MUAT DI UPT TERMINAL STASIUN SEMARANG TAWANG (SMT): STUDI KASUS PROSES BONGKAR MUAT KAI LOGISTIK. Diploma thesis, POLITEKNIK TRANSPORTASI DARAT BALI.

[thumbnail of COVER - BAB III] Text (COVER - BAB III)
18_Muhammad Fahmi Fauzi Cover - Bab III.pdf - Published Version

Download (670kB)
[thumbnail of BAB IV] Text (BAB IV)
18_Muhammad Fahmi Fauzi TUGAS AKHIR BAB IV.pdf - Published Version
Restricted to Repository staff only until 31 December 2033.

Download (309kB)
[thumbnail of BAB V - LAMPIRAN] Text (BAB V - LAMPIRAN)
18_Muhammad Fahmi Fauzi TUGAS AKHIR BAB V - Lampiran.pdf - Published Version
Restricted to Repository staff only until 31 December 2033.

Download (1MB)
[thumbnail of SIMILARITY] Text (SIMILARITY)
18_Muhammad Fahmi Fauzi_similarity .pdf - Published Version
Restricted to Repository staff only until 31 December 2033.

Download (6MB)

Abstract

In carrying out loading and unloading activities, the loading and unloading
workforce at UPT Terminal Semaratng Tawang (SMT) divides the number of work
shifts into two sessions, each of which is 12 working hours. Meanwhile, the volume
of activities at UPT Terminal SMT is quite busy but does not occur every day. This
is the focus of researchers to be used as research material by looking for the
influence between workload on TKBM performance, in which case the researcher's
hypothesis is that variable x negatively affects variable y. The purpose of this study
is to find the influence between workload and TKBM performance. The purpose of
this study is to find the influence between workload on the performance of TKBM
and provide solutions for the division of work sessions in accordance with existing
regulations. This research uses a cross sectional approach method (questionnaire)
by testing questionnaire data with a valid test, which must be above the value of 0.3
and the reliability test must be above 0.6, then after being tested earlier, the data
obtained is tested for the number of X and Y values using the Kolmogorv Smirnov
normality test with a value above 0.5. Then after fulfilling the test rules, the data
obtained is tested in simple regression for the effect must be less than 0.05 and no
effect is above 0.05.
From the research carried out, the answer is that it does not show influence because
it gets a value of 0.42 so that this research between variables x and y does not have
a significant effect. As for the duration of work can be divided into three namely at;
07.00-15.00, 15.00-23.00, 23.00 - 07.00, besides that there should be additional
TKBM to prevent the occurrence of lagging goods in certain conditions.
Keyword: workload, performance, TKBM, duration of TKBM work

Item Type: Thesis (Diploma)
Contributors:
Contribution
Name
Email
Thesis advisor
GILANG RUPAKA, S.P., M. Si., ANGGUN PRIMA
UNSPECIFIED
Thesis advisor
GOVIKA KRISNA DEWI, S.E., M.M., PUTU AYU
UNSPECIFIED
Additional Information: TA (2023)
Uncontrolled Keywords: Dalam pelaksanaan kegiatan bongkar muat, Tenaga Kerja Bongkar Muat (TKBM) di UPT Terminal Semarang Tawang (SMT) membagi jumlah shift kerja menjadi dua sesi, yaitu masing masing 12 jam kerja. Sedangkan untuk volume kegiatan di UPT Terminal SMT tergolong cukup padat namun tidak terjadi setiap hari. Hal ini menjadi fokus peneliti untuk dijadikan bahan penelitian dengan mencari pengaruh antara beban kerja terhadap kinerja TKBM yang dimana dalam hal ini hipotesis peneliti adalah variabel x berpengaruh secara negatif terhadap variabel y. Tujuan penelitian ini yaitu mencari pengaruh antara beban kerja terhadap kinerja para TKBM serta memberikan solusi pembagian sesi kerja yang sesuai dengan peraturan yang ada. Penelitiian ini menggunakan pendekatan cross sectional (kuisioner) dengan menguji data kuisioner dengan uji valid yaitu harus diatas nilai 0,3 dan uji reabilitas harus diatas 0,6, kemudian setelah diuji data yang diperoleh diuji jumlah nilai X dan Y menggunakan uji normalitas kolmogorv smirnov dengan nilai harus diatas 0,5. Setelah memenuhi kaidah uji data yang diperoleh dengan cara melakukan uji regresi sederhana, maka untuk berpengaruh harus kurang dari 0.05 dan tidak berpengaruh adalah diatas 0.05. Penelitian yang dilakukan menghasilkan kesimpulan yaitu tidak menunjukan pengaruh karena pada output uji regresi linier sederhana dengan aplikasi SPSS diperoleh nilai 0,247 sehingga penelitian ini pada variabel x tidak terjadi pengaruh yang signifikan terhadap variabel y. Durasi kerja dapat dibagi menjadi tiga yaitu pukul; 07.00-15.00, 15.00-23.00, 23.00 – 07.00, selain itu sebaiknya terdapat penambahan TKBM untuk mencegah terjadinya ketertinggalan barang di kondisi tertentu. Kata Kunci: beban kerja, kinerja, TKBM, durasi kerja TKBM
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Depositing User: Mr. Pandu Poltrada Bali
Date Deposited: 02 Dec 2024 11:53
Last Modified: 02 Dec 2024 11:53
URI: https://digilib.poltradabali.ac.id/id/eprint/232

Actions (login required)

View Item
View Item